PHILIPS LED Premium Classic A67 Clear Light Bulb [E27 Edison Screw] 17W - 150W Equivalent, Warm White (2700K), Non-Dimmable.

£7.495
FREE Shipping

PHILIPS LED Premium Classic A67 Clear Light Bulb [E27 Edison Screw] 17W - 150W Equivalent, Warm White (2700K), Non-Dimmable.

PHILIPS LED Premium Classic A67 Clear Light Bulb [E27 Edison Screw] 17W - 150W Equivalent, Warm White (2700K), Non-Dimmable.

RRP: £14.99
Price: £7.495
£7.495 FREE Shipping

In stock

We accept the following payment methods

Description

We will then work under hard shoulder, layby and lane closures 24/7 - the road will remain open to traffic until we remove the traffic management at the end of the work. We will do this overnight under two full road closures. Some footpaths will be closed while we work and bus stops in the area will be suspended. Access from Hulands quarry onto the A66 will become left-in, left-out only and the central reservation on the A66 closed to prevent right-hand turns at this location. Traffic intending to travel west on A616 to Flouch Roundabout shall be diverted onto the A629 northbound at Wortley junction and continue on the A629 northbound to its junction with Well House Lane. At the junction turn left onto Well House Lane and continue to Well House Lane/B6462 junction. At the junction turn left onto B6462 and continue to B6462/A628 junction. At the junction turn right onto A628 and continue to A628/A616 junction (Flouch Roundabout) where the diversion ends. We’ll be placing roadside signage at the road closure points two weeks ahead of these closure dates, to clearly signpost the diversion routes. To enter the competition, please use the QR code on the poster to access the entry form. Closing date is 18 November 2023. We’re also taking this opportunity to make a donation to a local charity. In the entry form, we’re asking for you to select one of four charities. The charity which receives the most votes will receive the donation.

A night-time alternate lane closure of the A644 Wakefield Road Roundabout below the bridge for installing and removing the temporary edge protection. While we recognise that a full weekend of resurfacing work can be very disruptive, it does mean that we can complete the work more effectively by working days and nights. This will minimise disruption during the week and employ carbon saving techniques. The work will started on Monday 3 July 2023 and will be carried out during the night between 8pm and 6am, working between Sunday and Friday nights. The project will be complete by winter 2023. During the overnight closures local signed diversions will be in place. As the A66 heads north, the A67 leaves at Morton Park to head east past Dinsdale and Durham Tees Valley Airport before joining with the A135 in Eaglescliffe. From there it heads south through Yarm and Kirklevington before joining the A19 road at Crathorne. [5]

10 00 Andrx 676

The outside lane will also be closed on the southbound carriageway in this area, along with the junction 46 northbound entry slip.

Construct a new dual-carriageway underpass below the existing Kemplay Bank roundabout – enabling free-flowing traffic along the A66 and improving access to Penrith and the A6 We will be resurfacing the north and southbound carriageway and replacing the road studs and markings between Brownieside and the junction with the B1341 Adderston at Purdy Lodge. While every effort has been made to ensure the accuracy of these mortality and morbidity tables this cannot be guaranteed and neither the CMI nor the Institute and Faculty of Actuaries (IFoA) accepts any responsibility for their use in practice. Work will be done overnight when traffic levels are lightest, to minimise disruption, between 7pm and 7am. A3(M)• A8(M)Bailliestonspur• A38(M)• A48(M)Cardiffspur• A57(M)• A58(M)• A64(M)• A66(M)• A74(M)• A92(M)October – 6 November Northbound M18 traffic, stay on the M1 to J33, Catcliffe Roundabout then at the roundabout go southbound on the M1, exiting onto the link road to the M18 October – 24 October Northbound M18 traffic stay on the M1 to J33, take A630 onto the A631 to Junction 1 of the M18 (Bramley Interchange). To do this work safely, we will utilise traffic management Monday through Friday nights from 8pm to 6am as below: To reduce the impact on road users, both the M62 and the A644 will remain open to traffic during this work; for the safety of road users and our workforce, 24/7 hard shoulder closures on both eastbound and westbound of the M62 will be in place. This is due to periods when temporary barriers will be in place. We aim to start work on Monday 16 th October working overnight Monday to Friday 8 pm until 6am and aim to complete by 19 December.



  • Fruugo ID: 258392218-563234582
  • EAN: 764486781913
  • Sold by: Fruugo

Delivery & Returns

Fruugo

Address: UK
All products: Visit Fruugo Shop